L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
Block wall works @ powerhouse in progress
Rebar @AB in progress
SP work @ headrace alignment in progress
Headrace track excavation in progress
Headrace track excavation in progress
Block wall @Powerhouse in progress
Concrete works @cable duct inside powerhouse
Excavation @ headrace line is in progress
Concrete @AB at penstock line is in progress
Concrete @ AB at headrace is in progress
Civil works @ Powerhouse is almost going to finish
Excavation at headrace in progress
Excavation at headrace alignment is in progress
AB concrete work @ Headrace in progress
Surgetank concrete works 100% completed
Cable duct inside in powerhouse in progress
Cable duct work inside powerhouse in progress
Wall @ powerhouse in progress
Wall @ powerhouse is in progress
Surgetank work in final stage