L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
AB45 @ headrace in progress
Support pier @ headrace in progress
Inner surface of surge tank
Finishing work inside powerhouse in progress
Floor slab inside powerhouse in final stage
AB rebar/formwork at headrace in progress
Finishing work @ powerhouse in progress
Flooring inside powerhouse in progress
Rebar works @AB at headrace in progress
Wall @ powerhouse
Wall @ powerhouse in progress
Surge tank structure completed
Block wall @ powerhouse in progress
Formwork @ control room slab in progress
Flooring @ powerhouse is ready for concreting
AB @ Headrace alignment is in progress
Flooring work inside powerhouse in progress
Block wall @ powerhouse in progress
Surge tank top level concrete completed
Flooring inside powerhouse in progress