L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
Rebar cutting/bending @Crane beam in progress
Powerhouse structure in progress
Beam and column @ powerhouse
Rebar works at Surgetank in progress
Production of construction material in progress
Excavation of AB @ penstock in progress
SP @ penstock alignment in progress
Powerhouse work in progress
Rebar work @ surge tank
Start rebar work @ Surge tank
Excavation @ AB at penstock line
Concrete work at AB27
Headrace track opening in progress
Concrete @ powerhouse beam
Column @ Powerhouse
Column at crane beam level @ powerhouse
Production of construction material
C/B rebar @ Surge tank
Cutting bending rebar @ surge tank
Construction material reached at site