L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
Progress @ control room area
Surge tank area Ready for pcc work
Excavation @ surge tank completed
Control room @ Powerhouse
Excavation at surge tank area
Concrete/rebar works @ powerhouse column
Track @ headrace alignment in progress
Track opening @ headrace alignment in progress
Tailrace/powerhouse junction structure in progress
Powerhouse structures are in active progress
Excavation work at surgetank in progress
Excavation @ Access to Surgetank
Headrace track excavation
Headrace track excavation from 2+800 to 3+200 in progress
Excavation @ Surgetank structure in progress
Access road to Surgetank
AB-5 concrete work in progress
MIV Foundation work in progress
Rebar work at control room area in progress
Column work at powerhouse in progress