L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
Plastering inside powerhouse in progress
Production of construction material
Material shifting at construction area
Stair for control room completed
Superstructure @ control room completed
Stair inside powerhouse completed
Control room at powerhouse are in progress
AB4/5 in progress at HR line
AB @ headrace line in progress
Stair inside powerhouse completed
Control room stair inside powerhouse cometed
Stair to control room second floor in final stage
AB works @ headrace line in progress
Control room top slab completed
Staircase @ control room in progress
Control room staircase in progress
Final stage slab @ control room ready for concreting
SP works @ penstock line in progress
SP work @ penstock line in progress
AB9 @ penstock line ready for concreting