L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
AB8 @ Penstock in progress
Finishing work in progress
Material shifting at Penstock line in progress
Excavation for AB at penstock line in progress
Powerhouse finishing work near to end
Finishing work at powerhouse is almost at the end
Mannual excavation @AB at penstock in progress
Finishing works @ powerhouse in progress
Finishing work @ powerhouse in progress
Plaster work inside powerhouse
Plaster work inside powerhouse in progress
Some SP @ penstock line completed
AB5 @ headrace in progress
AB8 ready for concreting
Excavation @ SP 29 at Penstock line
Compaction @ control room in progress
Rebar works @ AB6 at Penstock line in progress
SP works @ Penstock in progress
Plaster @ powerhouse in progress
SP works at penstock in progress