L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Hydromechanical Works (Phase-II)
Today's Progress:
Installation of Y-bifurcation in progress
HM bifurcation work in progress
Bifurcation pipe works
Installation of Bifurcation pipe work at powerhouse in progress
Fabrication of EJ is in active progress
Fabrication of Expansion joint is in progresd
EJ fabrication
EJ fabrication
Fabrication of EJ for headrace pipe in progress
Fabrication of Bend at AB-1 completed
Fabrication of Bifurcation Y is completed
Bellmouth @ Surge tank completed
Testing of Pipe at bifurcation
Fabrication of pipe for bifurcation area completed
Gate installation at connection bay in progress
Connecting canal gate
Installation of gate at connecting canal in progress
Work at overflow chanel in progress
HM work at headpond gate
HM work at headpond gate