L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
SP at penstock line in progress
Powerhouse finishing works in progress
Excavation @ penstock line in progress
SP at penstock line in progress
EM installation work begin at control room
AB48 works in progress
Headrace AB works in progress
Powerhouse finishing works in progress
AB concrete work @ Headrace in progress
AB works at headrace in progress
AB at headrace in progress
Switchgear room works in progress
Outer cable duct work in progress
Wall at control room
Wall at control room
Penstock line ready for pipe laying
AB6 formwork in progress
Penstock excavation in progress
AB6 @ penstock in progress
Outer cable duct work in progress
First