L.C. Energy Ltd.
Designed By:
Gorkhasoft Pvt. Ltd.
Email: softgorkha@gmail.com
Home
Documents
Salient Features
Main Report
Drawings
Legal Documents
Company Audit Reports
Status
Completed
In Progress
Budgetwise Expenses
Equity/Bank Loan
Work Progress
Summary Sheet
Progress Report
Site Progress
Civil Works
Hydromechanical Works (Phase-I)
Hydromechanical Works (Phase-II)
Electromechanical Works
Transmission Line
News
Organization
Board of Directors
Member Login
Project Info
Contact
General
Equity Investment
Gmail Login
Civil Works
Today's Progress:
Compacted filling at powerhouse floor
Control room flooring in progress
Sharewall @ bifurcation pipe in progress
Surgetank work in progress
Surgetank concrete works in progress
Rebar/formwork at AB28A completed
Roof and vertical GI sheet installation completed
Surgetank concreting for next stage
Powerhouse vertical sheet installation in progress
Control room flooring in progress
AB28A formwork in progress
Beam @ control room in progress
AB28 concrete in progress
Surgetank concrete work in progress
Powerhouse vertcal sheet installation
Powerhouse flooring in progress
Tailrace slab completed
Rebar work in progress
Rebar/formwork surgetank in progress
Concrete @Tailrace slab completed